The industrial sales tool · private project intelligence
Find private capital projects early enough to get on the bid list.
Industrial OpAtlas connects permits, regulatory filings and investment announcements so equipment suppliers can identify emerging projects and start relationships with owners and engineers. Built by an industrial sales rep who used to hunt for those signals one air permit at a time.
Nothing charged for 14 days. Cancel any time before then and you pay nothing.
See it workOne real project, from the first filing to the first email.
Your next project is already on file.
- 40,000+public records collected
- 30,000+projects and sites tracked
- 178public sources, checked daily
- 50k+signals: filings, news and AI-drawn links
Live from the database
Top projects this week
Real filings from the last few days. Members also see who is behind each one, the site, the people named on the filing and the research.
Loading this week's projects…
On the record: named projects
Reviewed pages with the owner, scope, stage and sources. See all
- Bristol Myers Squibb pharmaceutical manufacturing campus, HoustonPharmaceutical manufacturing campus · Houston, Harris County, Texas$2.3 billion (stated capital investment, Aug 2026) · Announced · evidence through Aug 10, 2026
- UCB biologics manufacturing facility, Rowen campus, Gwinnett CountyBiologics pharmaceutical manufacturing plant · Dacula, Gwinnett County, Georgia$2 billion (announced investment, Mar 2026) · Announced · evidence through Nov 13, 2026
- Amazon northwest Louisiana data center campuses (incl. Resilient Technology Park, Shreveport)Data center · Shreveport, Caddo and Bossier Parishes, Louisiana$18 billion (stated total planned investment, Aug 2026; up from $12 billion announced Feb 2026) · Announced · evidence through Aug 18, 2026
- Delta Access PipelineNatural gas pipeline (intrastate) · Louisiana$1.5 billion (estimated cost, Oct 2026 listing) · Announced · evidence through Oct 1, 2026
- SpaceX Terafab semiconductor fabrication plant, Grimes CountySemiconductor fabrication plant (advanced manufacturing) · Grimes County, TX, TexasMore than $16.8 billion (stated capital investment for the first phase, Aug 2026) · Announced · evidence through Aug 6, 2026
- Eli Lilly API manufacturing site, Generation Park, HoustonPharmaceutical API manufacturing plant · Houston, Harris County, Texas$6.5 billion (stated capital investment, Sep 2026) · Announced · evidence through Sep 21, 2026
See it in action
From first filing to first meeting.
Signals we track
30 kinds of early-warning filings in 6 groups (each explained in the Signal guide), pulled daily from 178 federal, state and local sources. Each filing is matched to a company and a site.
Environmental permits
- State air permits (NSR / PSD, minor source)
- Stormwater construction NOIs
- NPDES wastewater permits
- Large water withdrawals
- Federal environmental reviews (EIS / EA)
Site & construction
- Building & site development permits
- FAA obstruction filings (stacks, tanks, cranes)
- Army Corps 404 / Section 10 notices
- Foreign trade zone applications
Local & state government
- Rezoning & site plan agendas
- County tax abatements
- State incentive awards
- Economic development announcements
Energy & utilities
- Grid interconnection queues (all major grid operators)
- Planned power plants (federal energy data)
- FERC pipeline, LNG & compressor filings
- Utility commission large-load & special-rate deals
Financial & funding
- SEC 8-K / 10-K capex announcements
- Project lists in quarterly 10-Q filings
- Private activity bond allocations
- Federal grants, loans & water/sewer funding
Tanks, storage & wells
- New storage tank registrations
- Bulk petroleum & chemical storage
- Carbon storage (Class VI) wells
- Nuclear licensing filings
Get to the owner before the bid list does.
Start a 14-day free trial. Nothing is charged until it ends, and you can cancel any time. See plans and what happens after the trial.