Worked examples: from filings to projects
Three real projects from the Industrial OpAtlas database, showing how filings are linked into one project, how routine paperwork is kept out of your lead feed, and how a project's status is shown, including what is still unknown.
Assembled on November 26, 2026 from records our crawlers collected in November 2026. The dates are the dates on the filings, not the day we first saw them. We started crawling in November 2026, so we can't yet show how far ahead of an announcement we caught a project as it happened. We'll add that when we have it.
1. Eight filings, one project: an LNG export expansion in Cameron Parish, Louisiana
Between January and August 2026, eight separate records appeared for the CP2 LNG export terminal and its expansion. Each came from a different kind of filing, and on its own each tells you only part of the story. OpAtlas linked them into one project timeline by site and owner:
- Jan 16, 2026: notice that an application for the terminal's facilities was filed with federal energy regulators
- Feb 12, 2026: an aviation filing for a proposed three-stack flare system, 225 feet tall
- Mar 12, 2026: a request to add about 427 billion cubic feet a year of export authority
- May 26, 2026: the certificate application for the expansion
- Jun 9, 2026: expansion scope: six more liquefaction blocks, a gas-fired power plant and a third berth
- Aug 3, 2026: an application for export authorization, followed by two more filings through August 24
Why it matters to a salesperson: the flare filing names equipment and its size months before construction bids. Liquefaction blocks mean compressors, heat exchangers, valves and a large amount of instrumentation; a power plant means turbines, transformers and switchgear; a berth means marine loading equipment. Each filing is one click from the record behind it.
What it does not prove: a filing is not a final investment decision or an open bid. The stage label (announced, applied, in review, approved, under construction) follows the newest record, and the AI research on the project says which milestones are done, planned or not established, with sources.
2. Telling new work from routine paperwork
Most permit systems are full of renewals, transfers and inspections. They are kept out of the lead feed so that new plants and expansions are not buried, but the word "renewal" alone is not enough to throw a filing away. Real cases from the database:
| What the filing said | How it is treated | Why |
|---|---|---|
| An air permit application marked "Renewal/Modification" | Kept as a lead | A modification means new equipment, new limits or a process change |
| A groundwater withdrawal permit "renewal with increase" | Kept, as an expansion | More water means more capacity: pumps, treatment, storage |
| A tank registration for 24,000 gallons of new petroleum storage | Kept | A new tank, not an inspection of an old one |
| A notice that a large application is "available for public inspection" | Kept | That phrase is notice boilerplate, not an inspection |
| A temporary crane for maintenance work on a refinery unit | Screened out | Maintenance on an existing unit, not a new project |
| A straight renewal of an existing operating permit | Screened out | Nothing new is being built or bought |
As of November 26, 2026, about 1,750 filings are screened out as plain renewals and about 2,200 as routine in total. Screening is automated and can miss in both directions; members can flag a mistake, and those flags are used to tune it.
3. Status and open questions: a chemical plant expansion in Plaquemine, Louisiana
For the Shintech Plaquemine expansion (a second ethylene plant and added chlor-alkali capacity), the project record shows each milestone with its state and source:
- Aug 9, 2024, done: draft state air permits issued for the second ethylene plant and a second expansion project
- Dec 20, 2024, done: revised draft air permits proposed
- Final air permit: not established. No record found yet, and the page says so instead of guessing
- Mar 4, 2026, done: the company announced a $3.4 billion phased expansion
The draft air permits were public about 19 months before the announcement. That gap is the window this product is built for: the process design is being finished, and instrument, valve and equipment choices are still open. A later filing that moves a milestone (a final permit, a contract award, a delay or a cancellation) changes the record and the stage.
Check it yourself
The best test is your own territory. In the 14-day trial, pick what you sell and where, save about 20 projects, open the source filing behind each, and see whether you can name the owner, the stage and the next person to call. More: how it works and its limits, how it compares, coverage by state.
See every one of these projects on a live map, with the filing, the company, the stage and who to contact. New filings and news are added every morning.