Visitor field guide

Permit & project signal guide

Edition 1.0 · Reviewed November 20, 2026

Read the filing. Understand the opportunity. Choose your next move. This guide is for industrial salespeople: equipment, components, engineering, construction, utilities, rentals and operating services. Thirty practical cards explain what each kind of public paperwork means and help you answer three questions:

  1. Why does this project matter to what I sell? Match the documented scope to your offering and territory.
  2. Is a buying decision still ahead? Separate regulatory milestones from qualification, bid and award evidence.
  3. Who do I approach next? Find the owner, engineer, contractor or procurement team that controls your package.

This guide explains source types. Availability differs by agency, geography and record subtype; a guide card is not a promise of complete live coverage.

A filing is a starting point

A filing is a clue about a project, not a promise of an available contract. Start with what the source actually says, identify the equipment or service you sell, and establish who will buy it and when.

Public record is not public ownership, and neither is an open bid

A privately owned project can have public filings. Keep these four questions separate:

Keep separateWhat it answers
Public recordWhat information is publicly visible? A privately owned project can have public filings.
Project ownershipWho develops, owns or operates the facility?
Regulatory statusWhat has been applied for, studied, approved or withdrawn?
Package procurementWho buys your scope, and is qualification or purchasing still available?

A permit, a public notice or a public financing approval is not, by itself, an open bid. Look for the qualification, RFQ or award evidence for your package.

Four questions before you chase the lead

  1. What is actually proposed? Find a specific equipment, capacity, facility or service statement.
  2. Where do I fit? Match the documented scope to your offering and territory.
  3. Who controls that package? Distinguish owner, engineer, contractor, consultant and purchasing party.
  4. What is the next verified decision? Find the qualification, RFQ or award evidence. Keep it Unknown when evidence is missing.

The useful question: “Who will select the supplier for my scope, and when?”

Read the clocks correctly

  1. ExploreSite, demand, concept
  2. DesignScope and approvals
  3. ProcureQualify, quote, award
  4. BuildMobilize and execute
  5. OperateService and improve

Stages overlap. A signal's value depends on the package and what you sell. These are interpretation guides, not a measured timeline or guaranteed sales window.

Date or statusWhat it does and does not tell you
Public comment closesEnvironmental or regulatory participation deadline. It is not a bid deadline.
Capability / qualification duePossible access to later procurement. Read who may respond and what is requested.
Bid / proposal dueThe actual solicitation deadline, including amendments and time zone.
Proposed construction / operationsA schedule at the time of filing. It can change and does not establish equipment buying dates.
Permit issuedA regulatory outcome. It does not establish funding, project execution or contract availability.
Funding / design / equipment awardIdentify which kind of award. They close different decisions.
No award foundProcurement status is unknown; do not convert absence of evidence into an open opportunity.

Keep the original event date, publication date and first-seen date. New paperwork can describe old equipment.

Start with what you sell

These are suggested starting points. Confirm the specific equipment or work in the source before treating it as a purchase opportunity.

Your offeringFirst question and useful starting sources
Equipment & componentsIs my equipment explicitly in the scope, and who will specify or buy it? Air construction permits, FEED and capital plans, FERC, incentives, owner disclosures and supplier capability notices.
Electrical & automationWhat new load, generation, controls or distribution scope is documented? Generator queues, EIA, utility dockets, air and process expansions, site plans and NRC equipment changes.
Engineering & environmentalWhich alternatives, studies or designs are still being developed? NEPA and state review, water rights, coastal and Corps records, capital plans, site options and engineering selections.
Civil & marine constructionWho owns the site or marine package, and what is its current procurement stage? Corps, coastal and terminal reviews, site plans, utility work, stormwater notices and construction solicitations.
Buildings & mechanicalWhat building, fire, HVAC or facility system is supported by the documents? Local plans, incentives, development agreements, capital programs and facility procurement notices.
Water & treatmentIs new capacity, treatment, intake, discharge or storage actually proposed? Water rights, wastewater permits, SRF and WIFIA, capital plans, industrial expansions and utility records.
Rentals & site servicesWhich mobilization or field-service needs remain, even if major equipment is bought? Construction stormwater, FAA crane activity, building permits, award notices and construction updates.
Operations & maintenanceDoes this operating facility need inspection, monitoring, retrofit or ongoing support? Operating-permit changes, tank records, equipment modifications, operating assets and service procurements.

Signal cards by group

Environmental

Back to contents

Waterfront and civil

Back to contents

Airspace and construction

Back to contents

Energy infrastructure

EIA planned-generation surveys

Explore / Design and authorize / Build and commission / Operate and maintain

EIA's generator inventories describe existing and planned generating units. The annual EIA-860 includes proposed units; EIA-860M supplies preliminary monthly status information.

Possible sales fit: Electrical equipment, generation equipment, controls, cooling and water treatment, civil construction, maintenance.

Read the full card: what to look for, how to read the status, your next move →

NRC reactor licensing and amendments

Explore / Design and authorize / Operate and maintain

NRC records can describe a proposed reactor site, a new reactor licensing application, or a change to an existing license. These actions have different meanings and equipment implications.

Possible sales fit: Qualified nuclear equipment, electrical, instrumentation and controls, cooling and water systems, civil engineering, inspection and maintenance.

Read the full card: what to look for, how to read the status, your next move →

Back to contents

Water

Back to contents

Commercial and funding

Private activity bonds and financing approvals

Explore / Design and authorize

Public financing records can identify a private beneficiary, proposed facility and intended use of bond proceeds. Some qualified private activity bonds require an allocation of limited issuance capacity.

Possible sales fit: Manufacturing equipment, water and waste systems, energy infrastructure, engineering, construction, facility services.

Read the full card: what to look for, how to read the status, your next move →

Back to contents

Federal procurement

Back to contents

Local development

Back to contents

Planning and design

Back to contents

Equipment and operations

Storage-tank construction notices and registrations

Build and commission / Operate and maintain

State programs record regulated petroleum or chemical storage tanks and certain installation, modification, ownership or closure activities. Coverage depends on substance, size, use and jurisdiction.

Possible sales fit: Tanks, piping and valves, leak detection, secondary containment, coatings, inspection, environmental services.

Read the full card: what to look for, how to read the status, your next move →

Back to contents

Same filing, different sales paths

These are fictional teaching scenarios. They are not project leads or claims about current package availability.

The production-line clue

An air application proposes a coating line and emissions controls. Equipment, electrical and environmental reps each see a different possible fit. They check the documented scope, identify the owner and designer, and ask which packages remain in design or procurement. The public-comment date is not an equipment quote deadline.

One filing can support several sales paths. Confirm the scope for your offering.

The crane is on the calendar

An FAA filing describes erection work next summer. The equipment may already be ordered. Rigging, temporary power, scaffolding, transport or testing could still be relevant, but availability needs confirmation. Resolve the underlying project and contractor, then ask what work remains.

A future construction date does not establish an open equipment package.

The government is asking questions

A federal facility issues an RFI for a wastewater upgrade. A pump supplier and integrator read the requested capability and planning information, then respond through the stated process if qualified. They track any later solicitation separately; an RFI response is not an offer that forms a contract.

Match the response to the notice. Market research, a bid and an award are different.

The five-minute lead check

  1. Read the original. Open the source and confirm the record, date, action type and latest amendment.
  2. Find the physical scope. Capture a short source-supported description of the work. Avoid filling missing scope with assumptions.
  3. Resolve the project. Match owner, site, aliases and phase. Check whether the pin duplicates a project already being tracked.
  4. Identify the buyer. Use named applicants and consultants to find the responsible owner, engineer, contractor or procurement team.
  5. Check your window. Separate capability or qualification deadlines, bids, proposed construction and any verified package award.
  6. Choose the next step. Save and monitor; research the buyer; respond through the stated process; or mark the package committed and assess remaining scope.
  7. Keep the evidence. Store the source link, relevant passage or page, event date and what remains unknown.

A good next action is specific: “Confirm who buys the controls package and when supplier qualification closes.”

Glossary

Applicant
The entity submitting the filing; it may differ from the owner, operator, designer or buyer.
EPC
Engineering, procurement and construction. Scope and purchasing authority depend on the contract.
FEED / pre-FEED
Front-end engineering design and earlier definition work. Neither label proves a package remains available.
NOI
Notice of Intent. Its meaning depends on the program: stormwater coverage and environmental-review notices differ.
RFI / Sources Sought
Early information or capability gathering. Read the body, response instructions and purpose.
RFQ
May mean Request for Qualifications or Request for Quotation. The notice determines which.
RFP / IFB
Request for Proposal / Invitation for Bids. Eligibility, amendments and the actual submission process control.
ROD / FONSI
Record of Decision / Finding of No Significant Impact. Environmental-review outcomes, not equipment awards.
Award
Always ask what was awarded: funding, engineering, a prime contract or your specific package.
Procurement unknown
No verified evidence establishes current package availability. This is a useful status, not a defect.
Original event date
When the underlying project change occurred, separate from publication and first discovery.
Location precision
Exact filing coordinate, verified facility or site, or approximate geography. A precise-looking pin may still be approximate.

Primary-source references

Linked official sources support the definitions. Sales-fit suggestions and next actions are editorial guidance. Requirements vary by jurisdiction and can change.

  1. EPA: New Source Review Basics
  2. EPA: Basic Information about Operating Permits
  3. EPA: NPDES Permit Basics
  4. EPA: Stormwater Discharges from Construction Activities
  5. EPA: National Environmental Policy Act Review Process
  6. USACE: Section 408 Program
  7. FAA: Obstruction Evaluation
  8. FAA: Proposed Construction or Alteration, Part 77
  9. FERC: Interstate Natural Gas Facility Process
  10. FERC: Coastal Bend LNG Project
  11. Official CFR: 33 CFR 127.007
  12. MARAD: Deepwater Ports Frequently Asked Questions
  13. NOAA: Applying Federal Consistency
  14. FERC: Interconnection Final Rule Explainer
  15. EPA: How the Drinking Water State Revolving Fund Works
  16. EPA: WIFIA Loan Process
  17. SEC Investor.gov: How to Read a 10-K/10-Q
  18. SEC Investor.gov: How to Read an 8-K
  19. FAR 15.201: Exchanges with Industry
  20. GSA: How to Respond to Pre-Award Notices
  21. FAR Subpart 5.3: Synopses of Contract Awards
  22. FAR Subpart 36.6: Architect-Engineer Services
  23. International Trade Administration: FTZ production
  24. EIA: Preliminary Monthly Electric Generator Inventory
  25. EIA: Form EIA-860 detailed data
  26. IRS Publication 4078: Tax-Exempt Private Activity Bonds, January 2026
  27. EPA: Class VI wells used for geologic sequestration of carbon dioxide
  28. NRC: Combined License Applications for New Reactors
  29. NRC: Glossary - early site permit
  30. NRC: Types of hearings