Coast Guard waterfront terminal notices
Explore / Design and authorize
- What it is
Covered LNG and liquefied-hazardous-gas terminal projects submit Letters of Intent and Waterway Suitability Assessments for marine-safety review.
- Possible sales fit
Marine systems, gas storage, pipelines and loading arms, safety systems, engineering, terminal construction.
- Look for
Terminal owner, cargo, storage concept, vessel traffic, marine consultant and related FERC or Corps records.
- Read the status
An LOI or preliminary WSA is a planning and review event. Later recommendations and updates have different meanings.
- Your next move
Identify the land-side scope and its designer; ask when storage, berth and safety-system vendors will be selected.
- Watch out
For new terminals and qualifying expansions under 33 CFR 127.007(a), the LOI is due at least one year before construction. Public availability can lag, and equipment procurement can occur earlier. A traffic increase does not prove a new tank.