Coast Guard waterfront terminal notices

Explore / Design and authorize

What it is

Covered LNG and liquefied-hazardous-gas terminal projects submit Letters of Intent and Waterway Suitability Assessments for marine-safety review.

Possible sales fit

Marine systems, gas storage, pipelines and loading arms, safety systems, engineering, terminal construction.

Look for

Terminal owner, cargo, storage concept, vessel traffic, marine consultant and related FERC or Corps records.

Read the status

An LOI or preliminary WSA is a planning and review event. Later recommendations and updates have different meanings.

Your next move

Identify the land-side scope and its designer; ask when storage, berth and safety-system vendors will be selected.

Watch out

For new terminals and qualifying expansions under 33 CFR 127.007(a), the LOI is due at least one year before construction. Public availability can lag, and equipment procurement can occur earlier. A traffic increase does not prove a new tank.

Official sources

See these filings in the data

Numbers updated November 26, 2026 from the filings Industrial OpAtlas has on file

Browse what is being filed by state and by kind of project, read the monthly report, or see how filings are collected and labeled.

Find these filings as they happen. Industrial OpAtlas collects them every day, labels the project and stage, and maps them with the company and contacts, so you can act while the buying decision is still ahead.

Start a 14-day free trial See projects by state

More waterfront and civil signals

← All 30 signal cards