Construction stormwater permits address runoff from regulated earth-disturbing activity. A Notice of Intent may request coverage under a general permit.
Possible sales fit
Earthwork, erosion control, dewatering, equipment rental, temporary utilities, site services.
Look for
Operator, acreage, project name, site limits, anticipated earthwork dates and related permits.
Read the status
An NOI submitted is different from effective coverage. A modification may change operators or site details; a termination concerns ending coverage.
Your next move
Identify the site contractor and confirm the current mobilization schedule and outstanding site-service needs.
Watch out
This may be close to earthwork and too late for an already-selected major equipment package. Requirements differ by permitting authority.
Numbers updated November 26, 2026 from the filings Industrial OpAtlas has on file
Industrial OpAtlas has 1,559 of these on file, with 1,537 from the last 12 months and
441 from the last 90 days. Filings that are routine or carry no project are left out of these counts.
Among those labeled in the last 12 months, the split is 254 public bid (work bought by cities, counties, utility districts or agencies) to 1,283 private bid (work bought by companies).
Examples from the record
Gas power plant · Channahon, IL · May 2026
Water system · Joliet, IL · May 2026
Solar farm · Girard, IL · May 2026
Solar farm · Montgomery, IL · May 2026
Water system · COAL MINE, NM · May 2026
Water system · ST. MICHAELS, AZ · May 2026
These examples are more than six months old. Current ones, with the project name, company and contacts, are in the app.
Questions
Construction stormwater notices: how many are filed?
Industrial OpAtlas has 1,559 on file: 1,537 from the last 12 months and 441 from the last 90 days.
Construction stormwater notices: which states have the most?
In the last 12 months the most came from Illinois, Utah, New Mexico, Massachusetts.
Construction stormwater notices: what kinds of projects do they point to?
Most often solar farm, water system, transportation / airport / port, transmission / substation.
Construction stormwater notices: public or private bids?
Among those labeled in the last 12 months, the split is 254 public bid to 1,283 private bid.
Find these filings as they happen. Industrial OpAtlas collects them every day, labels the project and stage, and maps
them with the company and contacts, so you can act while the buying decision is still ahead.