State of Industrial Projects: November 2026
Through November 26, 2026 · updated weekly from public permits and filings
Industrial OpAtlas had 15,238 project filings on file across the US, with 1,955 new in the last 30 days. Texas led the country. Here is where industrial projects are being filed, and which kinds are growing.
Key findings
- 1,949 new industrial project filings were recorded across the US in the 30 days to November 26, 2026, up 1% on the 30 days before.
- Texas led the country with 281 new filings in the 30 days to November 26, 2026, followed by Indiana (206) and Louisiana (124).
- As of November 26, 2026, Industrial OpAtlas tracks 76 US industrial projects worth $500 million or more that are still announced, applying for permits or in review, with a combined stated value of $402.5B.
- Water system projects were the most active kind in the 90 days to November 26, 2026, with 831 filings.
- In the 90 days to November 26, 2026, 576 filings pointed to storage tank demand and 140 to pressure vessels, columns or spheres.
- Gas power plant projects grew fastest: 166 filings in the 90 days to November 26, 2026, up 148% on the 90 days before.
How to cite: Industrial OpAtlas, “State of Industrial Projects: November 2026,” https://industrialopatlas.com/reports/2026-11. Figures are as of November 26, 2026; what the numbers mean.

Top states, last 30 days
| State | New filings | vs 30 days before |
|---|---|---|
| Texas | 281 | −57% |
| Indiana | 206 | — |
| Louisiana | 124 | — |
| California | 111 | +141% |
| Pennsylvania | 104 | +33% |
| Florida | 95 | — |
| Illinois | 76 | −19% |
| Iowa | 68 | +55% |
| Ohio | 55 | −18% |
| Oklahoma | 46 | −35% |
| South Carolina | 46 | — |
| New Mexico | 43 | +16% |
| Georgia | 42 | — |
| North Carolina | 41 | −9% |
| Utah | 41 | +2% |
Fastest-growing project types
- gas power plant projects: 166 in the last 90 days, +148% on the 90 days before
- battery storage projects: 110 in the last 90 days, +108% on the 90 days before
- manufacturing plant projects: 313 in the last 90 days, +101% on the 90 days before
- oil and gas production projects: 104 in the last 90 days, +86% on the 90 days before
- chemical plant projects: 102 in the last 90 days, +67% on the 90 days before
- food processing plant projects: 73 in the last 90 days, +62% on the 90 days before
- advanced manufacturing projects: 143 in the last 90 days, +61% on the 90 days before
- solar farm projects: 357 in the last 90 days, +55% on the 90 days before
Most active project types, last 90 days
| Project type | Projects | vs 90 days before |
|---|---|---|
| Water system | 831 | — |
| Wastewater | 509 | — |
| Solar farm | 357 | +55% |
| Manufacturing plant | 313 | +101% |
| Transmission / substation | 296 | +8% |
| Pipeline / compressor station | 255 | +29% |
| Mining | 182 | +53% |
| Gas power plant | 166 | +148% |
| Advanced manufacturing | 143 | +61% |
| Transportation / airport / port | 135 | +7% |
How we count
A filing is one public record tied to an industrial project: an air or water permit, a grid interconnection request, a utility commission case, an incentive approval, a building permit and similar records. Routine paperwork that the AI reads as noise is left out. Project types come from reading each filing. Trends compare equal periods, so a quiet holiday week shows up as a dip. When we add a new source, its older filings can raise a count without any change on the ground; a change is shown only where the earlier period has enough filings to compare, and a dash (—) marks the rest. A project's value is counted once, however many filings repeat it.
Share this chart
Feel free to use the chart in articles and newsletters. Please credit Industrial OpAtlas with a link to this page. Copy this code:
<a href="https://industrialopatlas.com/reports/2026-11"><img src="https://industrialopatlas.com/reports/2026-11.png" width="600" alt="New industrial project filings by state, November 2026"></a><br>Source: <a href="https://industrialopatlas.com/reports/2026-11">Industrial OpAtlas</a>
See every one of these projects on a live map, with the filing, the company, the stage and who to contact. New filings and news are added every morning.
Black Friday: 50% off OpAtlas Pro for 3 months with code BLACKFRIDAY50, through Monday, Nov 30.