EIA planned-generation surveys
Explore / Design and authorize / Build and commission / Operate and maintain
- What it is
EIA's generator inventories describe existing and planned generating units. The annual EIA-860 includes proposed units; EIA-860M supplies preliminary monthly status information.
- Possible sales fit
Electrical equipment, generation equipment, controls, cooling and water treatment, civil construction, maintenance.
- Look for
- A new proposed generating unit
- A material capacity or technology change
- A status change supported by current owner and project evidence
- Read the status
Track the individual unit: proposed, construction, operating, retired or cancelled. A new release can contain old or revised plans.
- Your next move
Match the plant and generator identifiers to the developer, compare successive releases, and verify the engineering and package-buying schedule. EIA cautions that preliminary capacities are not facility commitments.
- Watch out
- An operating unit appearing in a fresh data release
- A delayed or canceled proposal
- A revised estimate mistaken for committed capacity
- Official sources