Interconnection records track proposed generation or storage seeking connection to the transmission system. Studies assess the connection and related system needs.
Possible sales fit
Electrical equipment, substations, transformers, generation systems, energy storage, civil and EPC services.
Look for
Developer, resource type, MW, location, queue status, study stage, proposed service date and network upgrades.
Read the status
Requested, under study, agreement executed, withdrawn and in service should not be grouped into one active-project status.
Your next move
Confirm the developer, site and project phase, then seek evidence of engineering, equipment selection and financing.
Watch out
Queue entry is not a construction permit or proof the project will be built. Generation queues also are not a complete list of new industrial electricity loads.
Numbers updated November 26, 2026 from the filings Industrial OpAtlas has on file
Industrial OpAtlas has 2,814 of these on file, with 601 from the last 12 months and
344 from the last 90 days. Filings that are routine or carry no project are left out of these counts.
Among those labeled in the last 12 months, the split is 24 public bid (work bought by cities, counties, utility districts or agencies) to 577 private bid (work bought by companies).
Examples from the record
Battery storage · South Coffeyville, OK · May 2026
Transmission / substation · Columbia, OR · May 2026
Transmission / substation · Columbia, OR · May 2026
Transmission / substation · Washington, OR · May 2026
Transmission / substation · Washington, OR · May 2026
Transmission / substation · Washington, OR · May 2026
These examples are more than six months old. Current ones, with the project name, company and contacts, are in the app.
Questions
Generator interconnection queues: how many are filed?
Industrial OpAtlas has 2,814 on file: 601 from the last 12 months and 344 from the last 90 days.
Generator interconnection queues: which states have the most?
In the last 12 months the most came from Texas, New York, Washington, Oklahoma.
Generator interconnection queues: what kinds of projects do they point to?
Most often solar farm, battery storage, gas power plant, wind farm.
Generator interconnection queues: public or private bids?
Among those labeled in the last 12 months, the split is 24 public bid to 577 private bid.
Find these filings as they happen. Industrial OpAtlas collects them every day, labels the project and stage, and maps
them with the company and contacts, so you can act while the buying decision is still ahead.