Amazon northwest Louisiana data center campuses (incl. Resilient Technology Park, Shreveport)

Data center · Shreveport, Caddo and Bossier Parishes, Louisiana Very large and still early

Evidence through Aug 18, 2026 · first published Nov 26, 2026 · last material update Nov 26, 2026

Amazon plans multiple data center campuses across Caddo and Bossier Parishes in northwest Louisiana, first announced in February 2026 as a $12 billion investment. In August 2026 Amazon added $6 billion and a third campus at Resilient Technology Park in Shreveport, raising the total planned investment to $18 billion and the expected new direct jobs for the expansion to 210. The evidence consists only of economic development announcements; no power capacity, permits, contractors or construction dates are given.

Owner
Amazon (as named on the filings)
Location
Shreveport, Caddo and Bossier Parishes, Louisiana
Project type
Data center
Scope
Multi-site Amazon data center development across Caddo and Bossier Parishes for cloud computing and AI, expanded in Aug 2026 to add a third campus at Resilient Technology Park in Shreveport.
Estimated value
$18 billion (stated total planned investment, Aug 2026; up from $12 billion announced Feb 2026)[1]
Regulatory status
No permit record in evidence
The sources are economic development announcements only. No air, water, building or grid interconnection filings for these campuses are in the evidence.
Commercial stage
Announced
Amazon has announced plans to invest $12 billion (Feb 2026), increased to $18 billion with a third campus in Shreveport (Aug 2026). No final investment decision, contractor award or construction start is stated.
[1]

Where the public evidence puts the project today. Permit approvals and commercial decisions are tracked separately below.

Track this project. Get an alert when a new filing, approval or milestone shows up, with the original records, the companies involved and who to contact.

Track this project Find similar projects in Louisiana

Milestones

DateWhatKindStatus
Feb 23, 2026Amazon announces $12 billion data center campuses across Caddo and Bossier Parishes[2]CommercialHappened
Aug 18, 2026Amazon adds $6 billion and a third campus at Resilient Technology Park, Shreveport; total planned investment $18 billion[1]CommercialHappened
Date not givenConstruction startConstructionNot established
Date not givenFirst campus in operationConstructionNot established

A target date is what a source said was planned, not proof it happened.

Equipment

Named in a source

No equipment is named in the public record yet.

Possibly relevant

  • Power transformers and substation equipment · Hyperscale campuses need large utility-scale power intake; transformers carry long lead times.
  • Medium- and low-voltage switchgear · Typically one lineup per power block at each data center building.
  • Emergency / standby generators · Data centers normally provide N+1 backup generation sized to IT load.
  • Diesel bulk storage and generator day tanks · Backup generator plants usually carry 24-48 hours of on-site fuel.
  • UPS and power distribution units · Standard for conditioning and backing up IT power in each data hall.
  • Cooling towers, chillers and computer room air handlers · Cloud and AI workloads require substantial heat rejection and room cooling.

Typical for this kind of project. Not confirmed for this one.

What it means for suppliers

With $18 billion planned across three campuses, this is a potentially very large program for electrical gear (transformers, switchgear, generators, UPS) and mechanical cooling, plus construction and engineering services. At announcement stage, long-lead electrical suppliers and design-build contractors would likely want to track it now, while tank, cooling and fit-out suppliers may find later procurement windows more relevant. Nothing in the evidence confirms what will be purchased or when.

Still unknown

Sources

  1. [1] Economic development announcement · Public record · Aug 18, 2026
  2. [2] Economic development announcement · Public record · Feb 23, 2026

Government records are described by kind, number and date. Members open the original record for every filing in the app.

Reviewed by the Industrial OpAtlas editor before publication. Found something wrong or out of date? Send a correction.

Cite this page: Industrial OpAtlas, "Amazon northwest Louisiana data center campuses (incl. Resilient Technology Park, Shreveport)", Nov 26, 2026, https://industrialopatlas.com/projects/1037-amazon-northwest-louisiana-data-center-campuses-incl-resilient-technology-park-s

Related projects

Industrial projects in Louisiana · Data center projects · All projects on the record