Storage tank project leads
Updated November 26, 2026 from public filings · what the numbers mean
Field-erected and shop-built storage tanks for terminals, refineries, chemical plants, LNG, water utilities, power plants and data centers, found in public filings before the tank package is bid.
655 filings in the last 90 days name storage tanks or point to them (up 113% on the 90 days before).
Which projects buy storage tanks
- New terminals and tank farms, and expansions of existing ones (crude, refined products, chemicals, renewable fuels).
- LNG and gas processing: full-containment LNG tanks, refrigerated storage, condensate and water tanks.
- Power plants and data centers: raw and demineralized water, fire water and fuel oil storage.
- Water and wastewater utilities: ground and elevated water storage, clearwells, equalization and digester tanks.
- Chemical, ammonia, hydrogen and fertilizer plants: product, intermediate and feedstock storage.
Which filings show it early
These kinds of filing tend to come before the equipment is bought: Air permits, Storage tank registrations, Water withdrawals, Water and wastewater project funding, FERC pipeline and LNG filings, Incentives and tax abatements, Rezoning and site plans, Building permits. Each link explains what the filing means for a sale.
New work or routine?
A tank registration or an air permit amendment can cover an existing tank being repainted, re-roofed or changed to a new product. New construction shows up as new tank IDs, added capacity, a new emission unit or a site-plan change; Industrial OpAtlas labels each filing as new build, expansion or routine.
Where
States with the most in the last 12 months.
- Texas336
- Missouri67
- Ohio66
- Indiana59
- Louisiana59
- Illinois58
- Pennsylvania54
- North Carolina46
- Georgia42
- Iowa42
Kinds of projects
- Water system373
- Water storage tank318
- Fuel terminal / tank farm93
- Wastewater72
- LNG facility60
- Oil & gas production51
- Manufacturing plant43
- Chemical plant42
How far along
- Approved710
- In review534
- Announced93
- Applied43
- Under construction2
Filed as
- FAA obstruction filings453
- Water and wastewater project funding298
- Air permits175
- Wastewater discharge permits114
- Water withdrawals61
- Stormwater notices56
- FERC pipeline and LNG filings46
- Storage tank registrations39
Newest filings
- Water storage tank · Washington, UT · Federal environmental reviews · Nov 2026
- Oil & gas production · San Juan, NM · Federal environmental reviews · Nov 2026
- Wastewater · Luzerne, PA · Water withdrawals · Nov 2026
- Wastewater · Cambria, PA · Water withdrawals · Nov 2026
- Nuclear plant · Mckinley, NM · Federal environmental reviews · Nov 2026
- Government / military · Batavia, IL · Federal bids and RFIs · Nov 2026
- Cement / aggregates · Sedalia, MO · Air permits · Nov 2026
- Nuclear plant · Mckinley, NM · Federal environmental reviews · Nov 2026
Project names, companies, the filings themselves and contacts are in the app.
What Industrial OpAtlas can confirm
When a filing names the equipment (a tank ID, a turbine model, a vessel in an emission unit list), the label says so. When it only tells us the kind of project, the equipment is what that kind of project usually needs, and the project page says it is not confirmed. Counts here are filings whose labels name or point to storage tanks; what the numbers mean.
See every one of these storage tanks projects on a live map, with the filing, the company, the stage and who to contact. New filings and news are added every morning.
Black Friday: 50% off OpAtlas Pro for 3 months with code BLACKFRIDAY50, through Monday, Nov 30.
Other equipment
Pressure vessel project leadsPump and compressor project leadsTurbine and generator project leadsTransformer and switchgear project leadsWater and wastewater treatment equipment project leads Named projects on the recordProjects by state