Updated November 26, 2026 from public filings · what the numbers mean

Power transformers, switchgear, breakers and substations for new generation, transmission, data centers and large industrial loads, found in grid and utility filings early.

2,346filings, last 12 months
916last 90 days
$61.5Bstated value, 90 days
10states with activity

916 filings in the last 90 days name transformers, switchgear and substations or point to them (up 67% on the 90 days before).

27 filings39 filings46 filings61 filings62 filings39 filings49 filings64 filings72 filings59 filings71 filings12 filings
Filings per week, last 12 weeks (the last bar is this week so far). A jump can mean a new source was added, not a surge on the ground.

Which projects buy transformers, switchgear and substations

Which filings show it early

These kinds of filing tend to come before the equipment is bought: Grid interconnection requests, Utility commission cases, Siting board cases, Rezoning and site plans, Building permits, FAA obstruction filings. Each link explains what the filing means for a sale.

New work or routine?

Line maintenance and small service changes are routine. New substations, new interconnections and large load requests are the early signs of a new equipment package.

Where

States with the most in the last 12 months.

Kinds of projects

How far along

Filed as

Newest filings

Project names, companies, the filings themselves and contacts are in the app.

What Industrial OpAtlas can confirm

When a filing names the equipment (a tank ID, a turbine model, a vessel in an emission unit list), the label says so. When it only tells us the kind of project, the equipment is what that kind of project usually needs, and the project page says it is not confirmed. Counts here are filings whose labels name or point to transformers, switchgear and substations; what the numbers mean.

See every one of these transformers, switchgear and substations projects on a live map, with the filing, the company, the stage and who to contact. New filings and news are added every morning.