Instrumentation and controls project leads
Updated November 27, 2026 from public filings · what the numbers mean
Process instrumentation, analyzers, emissions monitoring and control systems for refineries, chemical plants, LNG, gas processing, power plants and water utilities, found in public filings while the process design is still open and before the instrument specifications are set.
1,700 filings in the last 90 days name instrumentation and controls or point to them (up 140% on the 90 days before).
Which projects buy instrumentation and controls
- New process units and expansions at refineries, chemical, ammonia and hydrogen plants (pressure, flow, level and temperature measurement, analyzers, control systems).
- LNG liquefaction trains, pipelines and compressor stations (custody transfer metering, gas detection).
- Gas-fired power plants and HRSGs (continuous emissions monitoring, turbine and plant controls).
- Water and wastewater treatment plants (flow, level, pH and chemical analyzers, SCADA).
- Air permit changes that add emission units or limits (continuous emissions monitoring).
Which filings show it early
These kinds of filing tend to come before the equipment is bought: Air permits, FERC pipeline and LNG filings, Grid interconnection requests, Wastewater discharge permits, Water and wastewater project funding, Incentives and tax abatements, State environmental reviews. Each link explains what the filing means for a sale.
New work or routine?
An air permit renewal or a monitoring report at an existing unit is routine. A new emission unit, a new process line, added capacity or a new monitoring requirement points to new instrumentation; Industrial OpAtlas labels each filing as new build, expansion or routine.
Where
States with the most in the last 12 months.
- Texas711
- Pennsylvania208
- Louisiana205
- Illinois183
- Indiana159
- California116
- Ohio112
- Missouri96
- North Carolina82
- Iowa82
Kinds of projects
- Pipeline / compressor station561
- Water system499
- Wastewater490
- Gas power plant279
- Solar farm192
- Chemical plant153
- LNG facility120
- Advanced manufacturing81
How far along
- In review1,445
- Approved1,145
- Announced418
- Applied279
- Under construction35
Filed as
- Air permits642
- Water and wastewater project funding524
- FERC pipeline and LNG filings470
- FAA obstruction filings386
- Wastewater discharge permits291
- Stormwater notices201
- Water withdrawals143
- Incentives and tax abatements122
Newest filings
- Battery storage · Nobles, MN · Siting board cases · Nov 2026
- Nuclear plant · Roane, TN · Federal environmental reviews · Nov 2026
- Nuclear plant · Roane, TN · Federal environmental reviews · Nov 2026
- Nuclear plant · Covert, MI · Federal environmental reviews · Nov 2026
- Advanced manufacturing · Laurens, SC · Air permits · Nov 2026
- Pulp / paper / wood · Wayne, TN · Economic development announcements · Nov 2026
- Pipeline / compressor station · Beaver, PA · FERC pipeline and LNG filings · Nov 2026
- Pipeline / compressor station · Clarke, MS · FERC pipeline and LNG filings · Nov 2026
Project names, companies, the filings themselves and contacts are in the app.
Named projects that mention instrumentation and controls
- Eli Lilly API manufacturing site, Generation Park, HoustonPharmaceutical API manufacturing plant · Houston, Harris County, Texas$6.5 billion (stated capital investment, Sep 2026) · Announced · evidence through Sep 21, 2026
- Bristol Myers Squibb pharmaceutical manufacturing campus, HoustonPharmaceutical manufacturing campus · Houston, Harris County, Texas$2.3 billion (stated capital investment, Aug 2026) · Announced · evidence through Aug 10, 2026
- Delta Access PipelineNatural gas pipeline (intrastate) · Louisiana$1.5 billion (estimated cost, Oct 2026 listing) · Announced · evidence through Oct 1, 2026
- UCB biologics manufacturing facility, Rowen campus, Gwinnett CountyBiologics pharmaceutical manufacturing plant · Dacula, Gwinnett County, Georgia$2 billion (announced investment, Mar 2026) · Announced · evidence through Nov 13, 2026
What Industrial OpAtlas can confirm
When a filing names the equipment (a tank ID, a turbine model, a vessel in an emission unit list), the label says so. When it only tells us the kind of project, the equipment is what that kind of project usually needs, and the project page says it is not confirmed. Counts here are filings whose labels name or point to instrumentation and controls; what the numbers mean.
See every one of these instrumentation and controls projects on a live map, with the filing, the company, the stage and who to contact. New filings and news are added every morning.
Black Friday: 50% off OpAtlas Pro for 3 months with code BLACKFRIDAY50, through Thursday, Dec 10.
Other equipment
Storage tank project leadsPressure vessel project leadsPump and compressor project leadsTurbine and generator project leadsTransformer and switchgear project leadsWater and wastewater treatment equipment project leadsValve project leads Named projects on the recordProjects by state